Standards

Statewide  Water & Sewerage Standards

Southern Water in conjunction with Ben Lomond Water, Cradle Coast Water (the Tasmanian Water and Sewerage Corporations) has jointly adopted the following latest versions of WSAA Codes.

WSAA Bookshop Reference
Title 
WSA Code & Version
PC004  Sewage Pumping Code WSA 04-2005 Version 2.1
PC015  Sewerage Code of Australia – Melbourne Retail Water Agencies Integrated Code  WSA 02-2002 Version 1.0
PC016  Water Supply Code of Australia – Melbourne Retail Water Agencies Integrated Code  WSA 03-2002 Version 1.0
PC019  Pressure Sewerage Code of Australia  WSA 07-2007


Specifications & Drawings

The WSAA Codes can be purchased directly from the WSAA online bookshop. Any modifications or improvements to the WSAA Codes will be progressively added to this website in the form of Southern Water Supplements.

Approved Product Lists

Southern Water in conjunction with Ben Lomond Water, Cradle Coast Water (the Tasmanian Water and Sewerage Corporations) jointly adopted the City West Water (CWW) Approved Products Catalogues.

The CWW Approved Products Catalogues can be downloaded from: City West Water Approved Products.

City West Water Approved Products Catalogues
Products Catalogue for Non-Pressure Pipeline Systems
Pressure Pipeline Systems Products Catalogue
Sewage Pumping Station Systems Product Catalogue

Any modifications to the CWW Products Catalogues will be progressively added to this website in the form of Southern Water Supplements.  
  
Only the most current products listed in the CWW approved products catalogues together with any amendments contained within the Southern Water Supplement are allowed for use in the Southern Water service area.

Condition Of Use

These specifications, drawings and approved product lists were prepared to assist in the design and construction of water and sewerage infrastructure. The documents are designed to be used in conjunction with each other and under the supervision of Southern Water officers who are trained and experienced in their application.   Southern Water does not consider the documents suitable for use for any other purpose.

If you use these documents for any purpose which is not consistent with the above (including, without limitation, for carrying out any investigations, design, construction, engineering, maintenance or other work), you do so at your own risk.

The documentation only provides the minimum requirements. It is the responsibility of the designer to ensure that designs comply with all the relevant Australian Standards and other regulations.
It is the responsibility of the designer and the developer to ensure that safe construction methods are used and that the construction work complies with the approved design drawings and all the relevant standards and regulations.

Current Drafts for Comment

Standards drafts that have been issued for comment will be published here. You are encouraged to submit your comments in writing by the closing date by emailing to: standards@southernwatertas.com.au

Please submit comments on the following drafts by Wednesday September 1, 2010.

 

Suggestions

Southern Water welcomes your input into the ongoing development of standards and approved product lists and you are encouraged to submit your suggestions by emailing to:  standards@southernwatertas.com.au